Guides
Tiling guides
Straight answers to the questions we get asked most.
How long does a bathroom retile take?
A standard bathroom takes 3 to 5 days, including waterproofing, tiling and grouting.
Read the guideDo I need waterproofing under tiles?
Yes, in a tiled shower. Tiles and grout are not waterproof, so a membrane goes under the tiles. E3 sets the performance standard and E3/AS1 calls for a membrane under tiles in showers. Other wet areas depend on the design, so check the plans.
Read the guideHow much does bathroom tiling cost in Christchurch?
Tiling labour is about $70 to $110 per m² plus GST for standard tiles. Tiles are not included. Includes a worked shower example.
Read the guideRelated Services
Bathroom tiling ChristchurchWaterproofing ChristchurchCommercial tiling ChristchurchResidential tilingKitchen & splashback tilingFloor tilingWall tilingLarge-format tilingUnderfloor heating ChristchurchOutdoor & pool tiling ChristchurchFloor preparationTiling for buildersTiling for architectsAll Services →
JSR
Christchurch · Canterbury · Est. 2011
Let's discuss your project.
Whether you're a developer planning a multi-unit build, a builder coordinating a fit-out, or a homeowner renovating a high-quality space — we'll review your project and reply with a clear, itemised quote.
No obligation·Reply within 1 business day·Free on-site visits across Canterbury
