How much does bathroom tiling cost in Christchurch?

Our guide prices for tiling labour and waterproofing, a worked shower example, and what is quoted per job.

Tiling labour for a bathroom in Christchurch is about $70 to $110 per m² for standard tiles and about $110 to $150 per m² for large format, mosaic or stone, and tiles are not included. Waterproofing is about $70 to $120 per m² on top, depending on the membrane system and the job. All prices are plus GST. These are JSR's guide prices for 2026, not a quote. Strip-out, preparation, levelling, niches and extras are priced per job once we know your bathroom.

Our guide prices for 2026

Tiling labour only, plus GST. Tiles not included. These are per square metre of tiled area, walls and floor added together.

  • Standard tiles, floor and wall: about $70 to $110 per m².
  • Large format (60x60 and up), mosaic or stone: about $110 to $150 per m².
  • Waterproofing: about $70 to $120 per m², depending on the membrane system and the job.

Worked example: a small shower

Take a small shower about 1m x 1m and 2.4m high, with two tiled walls and a tiled floor.

  • Area: 2 walls (1 x 2.4 x 2 = 4.8 m²) plus the floor (1 m²) = 5.8 m².
  • Tiling labour at $70 to $110 per m²: 5.8 x $70 = about $406, and 5.8 x $110 = about $638. So about $406 to $638 plus GST.
  • Waterproofing at $70 to $120 per m²: 5.8 x $70 = about $406, and 5.8 x $120 = about $696. So about $406 to $696 plus GST.
  • The shower base (forming the tray) and the tiles are extra, and so is anything else on the list below.

What is not included

These are quoted per job, because they change a lot from one bathroom to the next.

  • Tiles.
  • Shower base forming.
  • Strip-out and preparation.
  • Floor levelling.
  • Niches.
  • Underfloor heating.
  • Plumbing and electrical.

What pushes the price up

  • Large format, mosaic or stone tiles, which are priced higher per m².
  • Niches and other built-in features.
  • Uneven floors that need levelling first.
  • Underfloor heating going in under the tiles.
How long a bathroom retile takes

What tiles cost on top

Tile supply is separate from our labour. As a typical retail guide only, not our price: ceramic is about $30 to $60 per m², porcelain about $50 to $100, and premium and stone tiles $100 or more.

We can supply your tiles, or install tiles you supply yourself. Ask us if you want help choosing tiles that suit the job.

How to get an accurate price

  • Send photos of the bathroom, or the plans if it is a new build.
  • Give us rough measurements, or tell us the tile size and where it goes.
  • Tell us about extras like niches, heating and the tile you have in mind.
  • We quote within 1 business day, with a site visit where needed. Site quotes are free across Canterbury.
Request a quote

Want this done properly on your job? See our bathroom tiling in Christchurch page, or request a quote.

Common questions

Why do you price per m²?

Tiling labour scales with the area covered, so per m² is the simplest way to give a guide. Your quote then adds the things that do not scale with area, like preparation and extras.

Do you charge for quotes?

No. Site quotes are free across Canterbury. Send photos or plans and we can sometimes give a price without a visit.

Can I supply my own tiles?

Yes. Both options work. JSR Tiling can supply your tiles, or we can install tiles you have chosen and bought yourself. If you are still choosing, we can recommend suitable tiles for the job.

Is waterproofing included in the tiling price?

No. Waterproofing is priced separately at about $70 to $120 per m² plus GST. We provide a PS3 producer statement for our waterproofing on every job.

Are these prices a quote?

No. They are our guide prices for 2026 so you can budget. The price comes in your written quote once we know the tiles, layout and preparation needed.

How long does a bathroom take?

A standard bathroom takes 3 to 5 days, including waterproofing and grouting. See our guide on how long a bathroom retile takes for the full breakdown.