Bathroom
Tiling
Christchurch
Bathroom tiling and waterproofing in Christchurch, by one team: set out properly, waterproofed to spec, finished clean. Typical bathroom: 2–5 days.
Waterproofing + tiling in one team · ARDEX & Mapei accredited · Free site quote
Request a QuoteBathroom Tilers for Renovations and New Builds
The bathroom is one of the most personal spaces in your home — and the right tiling makes all the difference. JSR Tiling's bathroom specialists handle everything from shower floors and feature walls to full bathroom floor installations, niches, and decorative inlays. Underfloor heating can go in at the same time; see underfloor heating in Christchurch.
Every bathroom tiling project begins with proper wet-area waterproofing, no exceptions. We then install your chosen tiles with precision, keeping grout lines consistent, cuts clean, and patterns perfectly aligned.
- Full shower installation — walls, floor, niche
- Freestanding bath surrounds
- Large-format floor tiles with correct falls
- Feature wall tiles and decorative patterns
- Mosaic and subway tile installations
- Grout colour selection and sealing
- Tile removal and substrate preparation
Ricky and his team have just completed our ensuite. We have used JSR 3 times now and can't fault them. From start to finish they are 100% fantastic.
Bathroom tiling we've completed.






Planning a bathroom? Get a clear quote.
Tell us about the job (photos or plans help) and we'll come back to you within 1 business day, with a site visit where needed.
Bathroom Tiling Questions
How much does bathroom tiling cost in Christchurch?
Bathroom tiling pricing depends on the room size, tile format, preparation required, waterproofing scope, layout complexity, and site access. Smaller straightforward labour-only bathroom tiling jobs may start from the lower thousands, while full bathroom tiling and waterproofing packages are quoted after inspection.
How long does it take to tile a bathroom?
A standard bathroom typically takes 2–5 days, including waterproofing, tiling, and grouting. Preparation, tile format, layout, and curing times all affect the timeline, and we confirm it when we quote.
Do you tile ensuites and wet rooms as well as main bathrooms?
Yes. As bathroom tilers we work on main bathrooms, ensuites, wet rooms, and shower areas, in both renovations and new builds, with the waterproofing done by the same team before any tile goes down.
Do you remove old tiles before installation?
Yes — tile removal and substrate preparation is part of our scope. We can strip existing tiles, patch and repair the substrate, apply waterproofing, and install the new tiles as a complete package.
What tile styles work best for bathrooms?
This depends on your aesthetic and budget. Large-format tiles (600×600mm or 800×800mm) create a modern, seamless look with fewer grout lines. Smaller mosaic tiles and herringbone patterns add texture and detail. We are happy to advise based on your space.
Do you waterproof shower floors and walls?
Yes — wet areas are waterproofed according to the relevant New Zealand Building Code requirements, site conditions, and the selected ARDEX or Mapei system specification. This is our standard practice on every bathroom.
Tiling across Canterbury
Based in Christchurch, we deliver commercial and residential tiling across the city and out to the Selwyn District.
Get a quote for your areaLet's discuss your project.
Whether you're a developer planning a multi-unit build, a builder coordinating a fit-out, or a homeowner renovating a high-quality space — we'll review your project and reply with a clear, itemised quote.
