How long does a bathroom retile take?
A standard bathroom takes 3 to 5 days. Here is what is in that time, what can stretch it, and how to keep it on track.
A standard bathroom retile takes 3 to 5 days of tiling work, including waterproofing, tiling and grouting. Preparation, tile size and layout, and waterproofing cure time all move that number, and we confirm it when we quote. This is the tiling stage only. A full bathroom renovation with plumbing and electrical work takes longer.
The stages of a bathroom retile
Most bathroom retiles follow the same order. Our 3 to 5 days covers waterproofing, tiling and grouting. Strip-out and preparation are quoted per job, and your quote will say what applies to your bathroom.
- Strip-out. Old tiles come off and the surface is checked. One NZ renovator puts a full strip-out at 1 to 3 days for a full renovation.
- Preparation. Walls and floor are made flat, sound and clean, with falls to the waste set where needed.
- Waterproofing and cure. The membrane goes on in coats, then has to cure. Cure time depends on the product, the temperature and the humidity, so we follow the manufacturer data sheet.
- Tiling. Floor only with a standard shower base is the short end. Full-height walls, a niche and feature strips take longer.
- Grouting and finish. Grout needs time to set before the shower is used. Check the data sheet for the product used.
What makes a retile take longer
- Hidden damage found once the old tiles are off, such as soft or damaged substrate.
- Cold or damp weather slowing the waterproofing cure.
- Large format tiles, patterns and detailed layouts, which take more set-out and cutting.
- Extra features such as niches, bench seats and underfloor heating.
- Tiles arriving late. Imported or special order tiles can take weeks, so order early.
- Changing the tile or layout after work has started.
- Other trades not being ready, for example the plumber who needs to reconnect after we finish.
How to keep it on track
- Choose and order your tiles before the start date, and have them on site.
- Settle the layout up front. We confirm the tile layout with you before we start, so changes mid-job are the exception.
- Book the plumber and any electrician for straight after tiling.
- Tell us about heating, niches and benches at quote stage so they are in the programme.
- Make sure we can get in on the agreed day, and that the bathroom is empty.
Retiling a bathroom in Christchurch
Canterbury winters are cold and often damp, which slows waterproofing cure, so allow a little extra time in winter. We can supply the tiles or install tiles you have bought yourself.
We quote within 1 business day, with a site visit where needed, and the quote includes the timeframe for your job.
See our bathroom tiling serviceWant this done properly on your job? See our bathroom tiling in Christchurch page, or request a quote.
Common questions
How long does it take to retile a shower?
A shower only job is usually shorter than a full bathroom, because there is less wall and floor to cover. The waterproofing cure time still applies, so we confirm the timeframe at quoting rather than guess.
How long after grouting can I use the shower?
It depends on the grout and any sealer used, so follow the product data sheet.
How long does waterproofing take to cure before tiling?
It varies with the product, the temperature and the humidity, so we follow the manufacturer data sheet for the membrane used.
Can I use my bathroom while it is being retiled?
No. The bathroom is out of use from strip-out until the grout and waterproofing have cured. Plan for another bathroom or toilet for those days.
Does underfloor heating add time to a bathroom retile?
It can. We supply and install the heating with the tiling, and we include it in the timeframe at quote stage.
What if you find damage once the old tiles are off?
Hidden damage can change the cost and the timeframe, so ask for it to be checked and priced before the work carries on.
Let's discuss your project.
Whether you're a developer planning a multi-unit build, a builder coordinating a fit-out, or a homeowner renovating a high-quality space — we'll review your project and reply with a clear, itemised quote.